First, you should find a quiet, open space where you can spread out your parts. I like to work from a bench or raised surface but any open floor space works well. Place your box face down and open by carefully cutting packing tape, remove all parts and locate face frame and side panels. You
will want to place the face frame (face down) on any scratch resistant
surface. The box you just opened will work nicely. Also, locate and open
the parts bag. This bag has plastic parts and extra screws. |
|
| If
you needed to reverse the hinge (door swing direction), (single door
base cabinet) It is much easier to do it now, before attaching side
panels. Simply remove the screws holding the hinge to the face frame,
flip door, and reattach to other side of face frame. (some cabinet
lines use hinge plugs in the door frame)
|
|
(metal bracket) insert locking screw |
|
| Because we supply products from several different distributors/manufacturers, you may find other assembly points (cam- locks) than what is illustrated here. All assembly points are pre set at the manufacturing facility and should not need to be moved or or realigned. | |
|
|
Before tightening the screws of the locking plate, be sure the ends of face and side panels are flush (even). Insert and tighten locking screw. Continue tightening brackets and inserting locking screws so both side panels are attached to face frame. You may want to attach kick plate now.
|
| Slide
floor panel into groves in side panels. Make sure floor panel is seated in
grove of face frame as well. Finished side of floor goes to inside of
cabinet. |
|
| Align
back panel "L" brackets to fit in side panel locking plates. |
|
| Make
sure back panel is seated in side panel edges before tightening brackets. |
|
| Install
drawer glides as shown...note left and right....wheel end goes to
front of cabinet...wheel is below screw hole. |
|
| assemble drawer box
Screw together the back wall and the two side walls, then slide the bottom panel into the pre cut groves before attaching the front plate (drawer head). Again depending on your cabinet line....you may want to use some wood glue on the dovetail joints (if applicable) |
|
| Insert
shelf clips and set in shelf. Note the finished edge of shelf faces
forward, towards door.
Insert
Rubber Bumpers to inside of drawer front and door(s). May need to
"wet" them. Install
plastic corner brackets as needed. These are used to screw your countertop
down to the cabinet. |
|
| Wall
cabinets are assembled in a similar fashion but should go much
faster (no drawers, toe kick,etc). I have found it much easier to
assemble the sides, top and bottom plate first, then attach the face frame,
and lastly, screw on the back plate from the outside. To determine left
or right hinging for single door "square" wall cabs, you
will simply turn the face frame prior to assembly...The bottom plate
(floor) is finished on both sides. Arched doors may have the pre
drilled hinge plugs rather than requiring a full hinge/frame flip. |
|
| Once
you have a couple of boxes under your belt, you should see that each box
takes about 10 to 15 minutes to complete.
***Assembly
Pictures Shown: using Carolina Oak, Charleston Birch, Spice Maple and
Tuscany Cherry
|
If
you run into any assembly problems please give us a call .... we're here to help!
386
761-4946 |